Minimum Viable Product

Ship the smallest thing that tests the riskiest assumption.

The smallest thing that can test the riskiest assumption with real users. Viable refers to the experiment, not to the product.

Minimum Viable Product

Time

2-6 weeks

Group

3-8

Output

An MVP and the learning it produced

Move

Prototype

Run sheet

How to run it

4 steps · 2-6 weeks

  1. 01

    Name the riskiest assumption

  2. 02

    Build the smallest test of it

  3. 03

    Release to real users

  4. 04

    Measure the behaviour

Say this

Lines you can read out as they are — no improvising under pressure.

“What would prove us wrong?”
“What is the cheapest way to find out?”
“Who are the first ten users, and how do we reach them?”

Set up

Before they walk in

  • □The riskiest assumption written as a falsifiable sentence
  • □The smallest test that could disprove it
  • □A measurement defined before launch

What to watch for

Signals and traps

It is working when

  • the MVP is smaller and more embarrassing than the team expected

It usually fails when

  • the MVP becoming a small version of the full product
  • no measurement plan

If it stalls, or the room is the wrong size

Variations

Run a concierge version by hand before building

Test demand with a landing page first

Ship to one segment only

Background

Where it comes from

From Eric Ries's The Lean Startup (2011), imported from lean manufacturing and startup practice: if the cost of being wrong is high, shrink the bet until being wrong is cheap.

Cautions

When it does more harm than good

  1. Name the assumption first or the MVP becomes a small version of the wrong product
  2. Viability is about learning, not about shipping something embarrassing
  3. An MVP without a measurement plan teaches nothing

When to use

Reach for it when…

You are starting something new

Uncertainty is high

Source

Ries, E. (2011). The Lean Startup. Crown Business.

Source phase: My methods (Kumar). Steps and the run sheet are written for this library, not quoted from the source.

Method Atlas — A coach's field guide to customer co-creation.