Sprint Prototype
Build a realistic facade good enough to test.
A realistic front end built in one day: enough to be believed, not enough to be engineered. Its only job is to survive Friday's test.

Time
1 day
Group
4-7
Output
A realistic prototype
Move
Prototype
Run sheet
How to run it
4 steps · 1 day
- 01
Choose the right fidelity
- 02
Assign build roles
- 03
Build only what the test needs
- 04
Rehearse the test with the prototype
Say this
Lines you can read out as they are — no improvising under pressure.
“What does the test need in order to be believable?”
“What can be faked without changing the finding?”
“What will we do when someone taps something we did not build?”
Set up
Before they walk in
- □The storyboard, fixed by Wednesday evening
- □Roles: one integrator, two builders, one content writer
- □A realistic device and realistic content
What to watch for
Signals and traps
It is working when
- the prototype is ready Thursday afternoon and has been rehearsed
It usually fails when
- engineering the back end
- placeholder content so obviously fake that the test collapses
If it stalls, or the room is the wrong size
Variations
Build a physical prototype instead of a screen
Build only the three critical screens
Put a human behind the curtain to answer
Background
Where it comes from
From Sprint. The prototype is deliberately fake where it does not matter and realistic where the test depends on it, which is a judgement call rather than a technical one.
Cautions
When it does more harm than good
- Build only the screens the storyboard needs
- Assign roles and one integrator
- Rehearse the test on Thursday evening with someone from outside the team
When to use
Reach for it when…
Friday testing needs something real
The concept must be felt
Source
Knapp, J., Zeratsky, J., & Kowitz, B. (2016). Sprint. Simon & Schuster.
Source phase: My methods (Kumar). Steps and the run sheet are written for this library, not quoted from the source.

